The Land Bridge Project (Shifting Sands) 2017

The Land Bridge Project (Shifting Sands) 2017

The Land Bridge Project (Shifting Sands) In its first incarnation, The Land Bridge Project took the form of a railed off excavation pit at the bottom of which was a square of wave washed sand in which paths of human footprints were preserved. The work, developed for a...
The Land Bridge Project (Sweden), 2016

The Land Bridge Project (Sweden), 2016

The Land Bridge Project (Sweden) 2016 The Land Bridge Project uses the language of exposed archaeology to give its message temporal context. The work takes the form of a railed off pit at the bottom of which is a square of wave washed sand in which are  paths of...